OEM & ODM Knitwear
KNITVELA offers OEM and ODM knitwear services for fashion brands. OEM production follows buyer-confirmed specifications, while ODM development starts from reference images or product direction.
Two Ways to Develop Knitwear
OEM and ODM projects start from different inputs. Both are reviewed for manufacturing feasibility before development or production is arranged.
OEM KNITWEAR
Production based on buyer-confirmed specifications.
The buyer provides technical specifications and product requirements.
KNITVELA reviews feasibility before production arrangement.
ODM KNITWEAR
Development from buyer-provided reference images or product direction.
KNITVELA reviews the product requirements and manufacturing feasibility before proceeding with sample development.
Should You Choose OEM or ODM?
Ready Stock, OEM and ODM are three separate options. This page covers OEM production and ODM development only; ready-stock items are handled separately. The right path depends on the product information you already have.
OEM is suitable when:
- The buyer has a confirmed tech pack.
- The buyer has confirmed measurements and specifications.
- The buyer already knows the required product construction.
ODM is suitable when:
- The buyer has reference images.
- The buyer has a product direction.
- The buyer needs to discuss product feasibility before sample development.
What to Prepare for an OEM Knitwear Project
Bring the product information you already have. KNITVELA reviews the requirements and discusses feasibility before moving forward.
Technical Documents
- Tech Pack
- Product specifications
Product Construction
- Measurements
- Construction details
Materials & References
- Yarn and material requirements, if specified
- Physical reference sample, if available
Start Your ODM Project with a Reference
ODM development starts from buyer-provided reference images or product direction. KNITVELA reviews the product requirements and manufacturing feasibility before proceeding with sample development.
01 — Reference Images
Buyers provide images to communicate the intended appearance and product direction.
02 — Product Direction
Buyers explain the intended product, target use and general requirements.
03 — Physical Reference Sample
Buyers may provide an existing sample for reference and project discussion.
SERVICE SCOPE
Supporting Your Knitwear Project
KNITVELA’s own team handles sample development, order management, finishing, ironing, measurement, quality control and packing. Knitting and linking are coordinated with stable long-term partner factories rather than directly owned facilities.
01
Sample Development
Sample development arranged according to project requirements.
02
Order Management
Order follow-up and coordination handled by KNITVELA’s own team.
03
Finishing & Ironing
Finishing and ironing completed by KNITVELA’s own team.
04
Measurement & Quality Control
Measurement and quality control handled by KNITVELA’s own team.
05
Packing
Packing prepared according to approved order requirements.
06
Knitting & Linking
Coordinated with stable long-term partner factories, not directly owned facilities.
MOQ and Production Timeline
Actual timelines depend on order requirements and production scheduling. The delivery schedule will be confirmed for each order. These figures are typical ranges, not guaranteed contractual deadlines.
100 PCS
MOQ starts at 100 pieces per style, per color, per size.
3–7 DAYS
Sample development typically takes 3–7 days.
AROUND 7 DAYS
Bulk orders are typically produced and delivered within around 7 days after order confirmation.
FAQ
OEM & ODM Knitwear Frequently Asked Questions
Common questions about OEM production, ODM development, MOQ and production timelines.
What is OEM knitwear?
OEM knitwear production follows buyer-confirmed specifications and product requirements.
What is ODM knitwear?
ODM development starts from buyer-provided reference images or product direction. KNITVELA reviews product requirements and manufacturing feasibility before proceeding with sample development.
What is the minimum order quantity?
MOQ starts at 100 pieces per style, per color, per size.
How long does sample development take?
Sample development typically takes 3–7 days. Actual timing depends on project requirements.
How long does bulk production take?
Bulk orders are typically produced and delivered within around 7 days after order confirmation. Actual timelines depend on order requirements and production scheduling.
Are ODM development fees charged?
ODM development fees, if applicable, will be assessed based on project requirements and confirmed with the buyer before development begins.
Can I request exclusive production?
KNITVELA’s default cooperation arrangement is non-exclusive. Any exclusivity, intellectual property ownership or usage rights must be agreed upon in writing.
What should I prepare before starting a project?
You may provide a tech pack, physical reference sample, reference images or product direction. KNITVELA will review the project requirements and discuss feasibility.
Ready to Discuss Your OEM or ODM Knitwear Project?
Related pages: Custom Manufacturing · Low MOQ Knitwear · Sample Development · Private Label